Decision records
A decision record is written when a choice changes a durable protocol, security, economic, privacy, repository or operational contract. It explains why; the pages of this reference say how. Changing a decision takes a new issue, and either an edit to the record before implementation or a new record that supersedes it.
| ADR | Title | Status | Decision |
|---|---|---|---|
| 0001 | Discovery benchmark targets beyond §D | accepted by the orchestrator in round 3 (2026-11-25). | The area keeps two self-checks, which are not §D budgets. |
| 0002 | Reading "median" in the protocol verify-ratio budget | accepted (2026-11-25, protocol round 5). | The budget is evaluated on the median ratio across all processes of a batch of at least 25, which is the rubric's literal wording. |
| 0003 | Billing of cancelled requests (A29 together with §5) |
accepted (2026-11-25, gateway round 3, item O1). | A29 is an upper bound on output billing, not a requirement to bill output. |
| 0004 | Select a settlement program at fresh funding; never move existing liabilities | accepted for local implementation and qualification. | Install each successor at a distinct program address. |
| 0005 | A settlement release publisher recommends; the buyer selects | — | One publisher per buyer-configured (publisher, genesis_hash, mint) feed. |
| 0006 | Historical discovery reads are optional analytics | accepted (implementation classification; no change to the frozen MVP wire contract) | GET /v1/price-history and the REST family-list option observation_history=1 are non-normative, read-only extensions. |
| 0007 | Make immutable parallel settlement domains the sole production program-upgrade gate | proposed (requires human decision on #14) | — |
<sub>Generated from docs/decisions.</sub>
The rulings that narrow the protocol contract itself, A1 to A35, are recorded in §9 of the MVP protocol contract and cited by number throughout this reference.